Doncaster Sports Stadium

Knauf severe duty partitions to height. Shaft walls to height. Knauf Aquapanel partitions. Beam encasements. Suspended ceilings. Luxalon ceilings. Specialist internal render systems. Thermal laminates. Sloping screeded shower room floors.
A difficult project with ‘in build’ specification changes completed within budget and on time – a real result.
Avon Valley School Project Rugby
20,000m2 Spray plaster of the highest possible standard.
I stud IWL partitions. Glasroc firecase beam encasements. Music room high acoustic value partitions. Feature bulkheads. MF suspended ceilings.
The whole project completed within budget and on time with commendations – a superb result.
Housing Development Pocklington
Part ‘E’ plasterboarding and plastering within two and three storey dwellings. Room in roof solutions.
Ninety high quality units completed within budget and on time. A real result for our client.
Kelham Island – Student Accommodation - Sheffield
900+ bedrooms for student accommodation. Lafarge severe duty, high performance twin frame partitions. Screeded landings and amenity rooms. High performance linings to Metsec structure. Glasroc firecase beam encasements. Suspended MF and feature ceilings. Curved partition walls and curved bulkheads and ceilings. Limited access.
The whole project completed within budget and on time – A real result.
St. Anns – Student Accommodation - Nottingham
Multi storey blocks for student accommodation. British Gypsum severe duty, high performance twin frame partitions. High performance linings to Metsec structure with insulations. Glasroc firecase beam encasements. Suspended MF ceilings. British Gypsum shaft walls. Limited access with a value engineered loading solution.
The whole project completed within budget and on time, with commendations - A real result for all parties.
Office complete fit out - York
12,000 ft2 Office fit out for a major developer. SAS partition build with integral door frames and Cherry doors. All ironmongery. Burglar, fire and smoke alarms. Bespoke Floor coverings. Decorations with Muraspec. Heating, electrical and ventilation solutions. Keypads. A Rapide Teamwork Project.
A fast track project – Five weeks! The whole project completed within budget and on time, with commendations - A real result for all parties.
St. Georges Mill – Conversion - Leicester
Multi storey existing building refurbishment project for conversion to luxury flats. Knauf severe duty, high performance twin frame partitions. Acoustic performance floating floors. High performance thermal linings to existing structure with insulations. Suspended MF ceilings with feature bulkheads throughout. Knauf shaft walls. Limited access with a value engineered loading solution and specification.
The whole project completed within budget and on time, with commendations - A real result for all parties.

600+ bedrooms for student accommodation in several blocks. Knauf severe duty, high performance twin frame and standard internal partitions. Flowing screed floors with resilient layers. 30,000m2 projection plaster to a very high standard. Feature bulkheads and beam encasements. Suspended MF ceilings. Limited access.
Part ‘E’ plasterboarding and plastering within multi storey blocks with an accelerated build programme. Parge coats to party walls. Flowing screed throughout with resilient and thermal value. Limited access with a value engineered loading solution.
Multi layered staggered plasterboarding with tape and jointing finishes within a multi storey timber framed block with a fast track programme. All insulations and vapour controls for resilient and thermal value. Limited programme contract period. Value engineered plaster boarding and insulation specification. External spray Weber monocouche render in panels to a high quality. Limited access with a value engineered loading solution.
Quality drylining and plastering within two and three storey executive dwellings. Room in roof solutions. Gypliner systems. Thermal boards. Flowing screed throughout with resilient and thermal value.
9000+ m2 Flowing screed throughout with resilient and thermal value. Difficult screed preparatory works caused by variations in level of existing floors. All brought to level with multi layered bulking E.P.S creating a cost effective floating floor solution to EFC4.
Lafarge severe duty, high performance partitions to 12m height with deflection detail. 70mm stud internal ‘stand alone’ partitions. The whole plywood faced at floor level for increased impact resistance. Megadeco board used to negate the need for decoration at high level. A Rapide value engineered wholly integral solution saving 40% off the original budget!!